Photovoltaic Project by ProSolar Tech LTD – Teterow, Germany

Engineering, Execution, and Quality in Accordance with European Standards

In the city of Teterow, Germany, ProSolar Tech LTD successfully completed the construction of a large-scale photovoltaic park, designed and executed to meet the highest European standards in engineering and quality assurance. The project represents another significant step in the company’s ongoing expansion across Germany, reinforcing its position as a trusted EPC contractor for renewable energy infrastructure.

From the earliest planning stages to the final commissioning, every aspect of the project was handled internally — design, structural calculations, production, and installation. This fully integrated EPC approach ensured not only compliance with German safety and construction regulations but also a consistently high level of precision, cost-efficiency, and durability.

Planning and Technical Preparation

The project began with a thorough assessment of the terrain in Teterow — a region with clay-rich soil and variable elevation levels that required precise engineering solutions. The ProSolar Tech LTD design team conducted geotechnical studies and structural simulations according to DIN EN 1991 / Eurocode 3, defining an optimized foundation system capable of withstanding the specific load and climate conditions of the site.

Based on these analyses, a tailored steel substructure was developed, designed for long-term stability, minimal maintenance, and compatibility with the selected photovoltaic module format. The layout and tilt of each module row were calculated to maximize annual energy yield, while the electrical configuration was planned to ensure efficient energy transmission and minimal losses.

Photovoltaic Project by ProSolar Tech LTD – Teterow, Germany

The technical documentation — including structural drawings, material specifications, and assembly procedures — was produced entirely in-house. This internal workflow allowed faster decision-making, better coordination between departments, and complete control over design adjustments during the project.

Execution and Installation

Construction of the photovoltaic park was coordinated by ProSolar Tech LTD’s on-site engineering team and executed in collaboration with regional installation specialists. The work included the driving of steel foundations, assembly of load-bearing beams, and mounting of modules using anodized aluminum clamps. All structural components were produced in the company’s own facilities and hot-dip galvanized according to EN ISO 1461, ensuring long-term corrosion protection.

Laser-guided alignment was used throughout the installation to achieve perfect geometry and consistent module positioning. Every step — from logistics and material handling to torque control and electrical connection — was documented and verified through a multi-stage inspection process. The result was a clean, efficient assembly with minimal impact on the environment and full compliance with German construction and electrical standards.

The project was completed on schedule and successfully commissioned after final performance and insulation tests. The Teterow photovoltaic park now operates as a robust, utility-scale renewable energy system, supplying clean electricity to the local grid.

Results and Cooperation

The successful completion of the Teterow project reflects ProSolar Tech LTD’s ability to deliver turnkey photovoltaic solutions that balance technical precision, cost efficiency, and long-term reliability. By managing the entire process internally — from engineering to manufacturing and installation — the company ensured seamless coordination and consistent quality control throughout every project phase.

Close collaboration between the technical team, local contractors, and the client was crucial to the project’s success. Transparent communication, scheduled inspections, and proactive problem-solving minimized delays and ensured that both construction and electrical works advanced in perfect synchrony.

The final installation demonstrates the company’s engineering strength and practical understanding of real-world construction challenges — resulting in a solar park that meets the highest expectations of the German renewable energy market.

Commitment to the Future

For ProSolar Tech LTD, the Teterow photovoltaic park represents more than just another completed project — it stands as proof of the company’s commitment to building durable and efficient renewable infrastructure across Europe. Each installation contributes to reducing emissions, strengthening local energy independence, and advancing the European energy transition.

With a growing portfolio of photovoltaic parks in Germany and other EU countries, ProSolar Tech LTD continues to set high standards in EPC execution, structural engineering, and integrated project management. The company remains dedicated to precision, quality, and sustainability — from the first technical drawing to the long-term operation of each solar installation.